News Education Local News Nation & World New Mexico

Community Road Work Conditions

Community road work conditions for Friday, Nov. 8.

U.S. Highway 160 Eastbound/Westbound between Cortez and Towaoc (Milemarker 37-27).

Through November from 7 a.m. to 7 p.m. Monday to Friday there will be one lane alternating traffic for paving operations. Fifteen minute delays are possible.

The city of Durango Community Development Department’s fall construction of the Downtown Sidewalk Improvement Project has resumed. Each side street will require approximately 2 weeks to complete. Construction will continue on the east side streets, moving south until reaching East 7th Street. At which point construction will begin on the west side streets then heading north. For more information, call 375-4850 or email gregg.boysen@durangogov.org.

Work is underway to improve the intersection of U.S. Highway 160 at Hurt Drive and Badger Road, located in the Aspen Springs subdivision area west of Pagosa Springs. Motorists will encounter single-lane alternating traffic and some travel delays on both U.S. 160 and the drives Monday through Friday during daylight hours. Some nighttime work is possible, and will be announced. Crews will suspend work for the winter likely in November and the project will resume in March with a completion date of late September 2014. For more information, call 731-2918.

A section of the U.S. 160/550 west-side frontage road will be closed for three months while Mercury Payment System’s contractor, Okland Construction, constructs an underpass beneath U.S. Highway 160/550 that will connect the La Posta Road on the west side with the new Mercury Village Drive on the east side. Through Dec. 9 the contractor will close the U.S. 160/550 west-side frontage road between West Turner Road and the entrance to the Durango Gun Club. West Turner Road will remain open, as will access to the Gun Club from the south. People wanting to get to the Gun Club can take River Road and travel north on La Posta. For more information, visit www.cotrip.org or call 511.

Colorado 184 eastbound/westbound between Dolores and Mancos (Milemarker 22-24).

Through November from 7 a.m. to 5 p.m. Monday to Friday there will be one lane alternating traffic for paving operations. Delays to 15 minutes possible.

U.S. Highway 160 eastbound/westbound in Durango (Milmarker 91-121).

Through November from 9 a.m. to 4 p.m. Monday to Friday there will be one lane alternating traffic for shoulder work and ditch cleaning. Fifteen minute delays are possible.

Colorado Highway 145 northbound/southbound in Cortez (Milemarker 1).

Through November from 8 a.m. to 5 p.m. Wednesday through Friday there will be one lane alternating traffic for irrigation pipe repairs. Fifteen minute delays are possible.

Colorado Highway 172 eastbound/westbound between the Florida River and Oxford north of Ignacio (Milemarker 16-19).

Through November from 9 a.m. to 4 p.m. Monday to Friday there will be one lane alternating traffic for paving operations in three locations. Ten minute delays are possible.

Motorists on U.S. Highway 550 (North Main Avenue) will encounter these work zones through mid-November:

Atmos Energy will work on 18th Street through today. Atmos will remove a concrete panel in the southbound, right lane of the roadway to bore under Main Avenue to locate existing utility lines. Motorists on southbound North Main Avenue will encounter a closure of the right lane approaching 18th Street, from 8:30 a.m. to 4 p.m. through Friday.

The city of Durango is estimated to work between 31st and 32nd streets from Nov. 13 to 15. The city will make repairs to a water main under the northbound, right lane. Motorists will encounter a closure of the northbound right lane from 8:30 a.m. to 4 p.m.

For more information, call 325-2244 or email SH145Telluride@publicinfoteam.com.

Nov 7, 2013
Car crashes into day care playground


Reader Comments